The seven concrete sludge drying beds are centrally located in the domestic sewage treatment plant serving the Bundy training area. A concrete area separates three beds to the west and four beds to the east; grass areas border the beds and a steep grade uphill is present to the west. The area is utilized on a limited basis due to the minimal amount of flow moving through the plant since the operational closure of Naval Station Roosevelt Roads on March 31, 2004 and the transition of the facility into caretaker status. This unit does not manage or generate RCRA hazardous wastes or constituents. NAPR has no knowledge or evidence of systematic and routine releases of hazardous wastes or constituents from this SWMU.

Status

  • A Revised Final Phase I RFI Work Plan was submitted to EPA for approval on October 11, 2006.
  • EPA approved the Phase I RFI Work Plan on October 20, 2006.
  • The Phase I RFI field work was conducted between November 10 and November 20, 2006.
  • The Final Phase I RFI Report was submitted to the EPA on November 9, 2007.
  • EPA approved the Phase I RFI Report on January 7, 2008.
  • Based on EPA comments on the Phase I RFI Report, the Navy recognized the need for a full RFI at this site.
  • The Draft Full RFI Work Plan for SWMUs 27, 28, and 29 was submitted for EPA review on August 31, 2007.
  • EPA approved the Full RFI Work Plan on January 7, 2008.
  • EPA approved the Final Full RCRA Facility Investigation Report (RFI) submitted on August 28, 2008.